Skip to content
Stelys / Commercial bottle filling stations

Bottle-filling stations for schools, gyms, and public buildings.

Two commercial formats, one simpler buying conversation. Stelys is built for daily refill traffic in gyms, schools, and public buildings, with full spec sheets ready when your plumber, contractor, or facilities team wants the exact numbers.

Schools + gyms + public buildings
Commercial stainless build
Cold water + bottle refill
No deposit to quote
Specs when you need them
Cold water
Chilled close to fridge temperature

30 L/hr at 6-8 °C on the S1 Wall

Busy periods
High refill volume without long lineups

200 L/hr ambient flow

Built for wear
Heavy-gauge commercial stainless steel

SS304 construction throughout

Quote reply within two business days. Lead times and site questions confirmed before PO.

Stelys
S1 / Catalog
S1 Wall
Cooler + bottle filler
Stelys S1 Wall commercial bottle filling station
Model
STL-S1-W
Starting price
CA$1,999
Format
Wall-mounted combined unit
Build
SS304 commercial stainless
First-pass review

What a buyer usually wants answered before the order form shows up.

  • Specs By Model
  • Reply In 2 Days
  • No Deposit To Quote
  • Rough-In Notes Welcome
  • Wall + Floor Formats
  • Utilities Reviewed Early
01 — Materials

Commercial build quality, explained plainly.

Stainless steel throughout, chilled water for daily use, and documented technical detail when your team needs it. The homepage keeps the story simple; exact output, pressure, and construction numbers live on the spec sheets.

Commercial stainless
SS304 cover, shell, and tank
Heavy-gauge build
1.0 / 0.8 / 1.2 mm wall thicknesses
Cold reservoir
3 L ice tank capacity
Near-fridge cold water
30 L/hr at 6-8 °C
High refill volume
200 L/hr ambient output
Standard site plumbing
0.1-0.35 MPa feed pressure
What owners care aboutPT-1359
01

Touchless bottle fill with a 15-second automatic shut-off.

02

Manual fountain controls stay easy to use for quick drink breaks.

03

Lead-free waterways and stainless contact surfaces where people actually touch the unit.

04

Cooling is built for daily commercial use, not occasional residential use.

05

Works with standard site plumbing and typical indoor operating conditions.

06

The detailed certifications and technical notes stay on the source sheet and full specs page.

Technical detailFIG. 01 / S1
SS304 — UPPER COVER1.0 MM ROLLED, RIM FOLDED INSIDESS304 — OUTER HOUSING0.8 MM PRESSED PANELSS304 — INNER TANK1.2 MM, FULL-PERIMETER WELDEDLEAD-FREE WATERWAYSCCK KOREA-IMPORTED PE PIPE
02 — Product

Pick the format that fits the room.

S1 Wall gives you chilled drinking water and bottle refill in one wall-mounted station. S2 Floor is the freestanding option for open interiors where a wall mount does not make sense.

Catalog
STL-S1-W
Stelys S1 Wall bottle filling station on a clean studio background

Stelys S1 Wall

Wall-mounted · combined unit
Site price
CA$1,999

A combined cooler and bottle-filler for gyms, schools, and public interiors. It keeps cold drinking water and bottle refill in one wall-mounted station.

Cold water
Chilled close to fridge temperature
30 L/hr at 6-8 °C
Busy periods
High refill volume without long lineups
200 L/hr ambient flow
Build
Heavy-gauge commercial stainless steel
SS304 shell, cover, and tank
Catalog
STL-S2-F
Stelys S2 Floor freestanding bottle filling station on a clean studio background

Stelys S2 Floor

Floor-embedded · narrow
Site price
CA$2,199

A freestanding refill station for open interiors where a wall unit does not make sense. It keeps the footprint narrow while still giving you chilled water and touchless refill.

Cold water
Chilled water from a freestanding unit
30 L/hr at 8-12 °C
Placement
Works where there is no usable wall location
Freestanding floor format
Open-plan use
Built for steady refill traffic in larger rooms
Exact power and pressure details on full spec sheet
03 — PT-1359 field manual

An engineering view, pulled from the install manual.

The PT-1359 manual is not just paperwork. It exposes the rough-in envelope, pressure assumptions, mounting sequence, service access, and mechanical anatomy behind the S1 Wall.

Source
PT-1359 manual
Figures
1–10
Part callouts
37
Install pressure
20–60 psi
Service setting
45–50 psi
Figure 2 from the PT-1359 installation manual
Figure 2 / PT-1359
04 — Where it goes

Built for places that actually use water.

Job sites, gyms, schools, hospitals, transit hubs, government buildings, and shared lobbies. The common thread is repeat daily use — not decorative placement.

  • 01 / 08
    Construction & Industrial
    Hard-use sites
  • 02 / 08
    Gyms & Studios
    Refill between sessions
  • 03 / 08
    Schools
    All-day traffic
  • 04 / 08
    Hospitals & Clinics
    Hygiene-sensitive
  • 05 / 08
    Airports & Transit
    High throughput
  • 06 / 08
    Government Buildings
    Public counters
  • 07 / 08
    Commercial Lobbies
    Shared circulation
  • 08 / 08
    Public Buildings
    General access
05 — Comparison

Stelys vs. Elkay EZH2O.

If the project doesn't need Elkay's deeper filtration and certification stack, Stelys makes the stronger value case. Lower price, more voltage range, more explicit construction data, one buying path.

Elkay column summarizes current on-wall stainless EZH2O pages (LZO8WSSK, EMABF8WSSK, LMABF8WSSK).

Upfront price
Stelys S1 WallCA$1,999
Elkay EZH2OUS$2,907–$3,158 on stainless on-wall combined units
Voltage flexibility
Stelys S1 Wall110V / 220V · 50/60 Hz
Elkay EZH2O115V / 60 Hz
Activation in one config
Stelys S1 WallTouchless bottle fill plus four manual cooler push pads, same SKU
Elkay EZH2OTouchless and manual layouts split across different SKUs
Construction detail
Stelys S1 WallSS304 · 1.0 mm cover / 0.8 mm shell / 1.2 mm tank
Elkay EZH2OStainless steel listed; gauge not published on referenced pages
Output data
Stelys S1 Wall30 L/hr cold @ 6–8 °C · 200 L/hr ambient
Elkay EZH2O8.0 GPH chilled · 1.1 GPM fill; no separate ambient figure
Buying path
Stelys S1 WallOne product code · one packing dimension
Elkay EZH2OCooler and bottle filler shipped as separate boxes

Based on Elkay EZH2O product pages as of April 25, 2026. Elkay retains a deeper filtration, certification, and accessory ecosystem. Stelys is not affiliated with Elkay.

06 — Product specs

Need the exact numbers? They're all in one place.

The homepage is written for fast understanding. The spec page keeps the full dimensions, utilities, performance numbers, source notes, and model comparison for the people who want the technical detail.

Straight to fit and utilities

Each model keeps dimensions, power, pressure, and mounting format in one place for a quick contractor check.

Clear line between facts and assumptions

Published numbers stay separate from site-dependent installation questions, so the page is easier to trust.

Easy to hand off

When an owner wants the short version and a contractor wants the exact numbers, both conversations stay clean.

07 — Installed

Product, in context.

Catalog and installation imagery for finish review, layout review, and a sense of how the line sits in real interiors.

Athletic gym member filling a bottle at the Stelys S1 Wall water station in a modern fitness club
Gym / refill bay

Stainless refill access placed where training traffic actually moves.

Stelys wall-mounted bottle filling station shown in a finished interior setting
Installed wall unit
Close-up of touchless bottle filling at the Stelys wall unit
Touchless fill detail
Stelys wall-mounted bottle filling station installed in a hallway interior
Hallway install
08 — Quote review

Start a quote review.

Send the building type, likely quantity, and any rough-in or access notes. We reply within two business days with the matching model, current timing, and the site questions that still need an answer before the order gets written.

Best first message
Building type · qty · rough-in notes

If you already know water pressure, power constraints, mounting preference, or delivery timing — include it. The first reply will be sharper for it.

Quote request formReply within two business days

No deposit required · Reply within two business days

09 — FAQ

Common questions.

What does a quote request commit us to?
Nothing financial. Send quantities, building type, and any rough-in notes. We reply with the matching model, current timing, and the questions still open. No deposit required.
When do you confirm delivery timing?
Once quantities and site requirements are clear. If you have a hard delivery date, note it and we'll answer against the current production window.
Are Stelys units ADA compliant?
S1 Wall is designed to ADA-compliant geometry. Final compliance depends on mounting height, clearances, and how it's installed on site — same as any wall unit.
What's the warranty?
Warranty terms are on the order form. If you need the language earlier, ask in the notes and we'll send it before any deposit.
Do you handle installation?
No — Stelys ships the unit. The useful pre-quote review covers mounting type, water pressure, power, and access constraints, so your plumber walks into a clean job.
Can we request a pilot placement?
Yes. If you're evaluating for a school, public building, or multi-site rollout, say so in the notes. We prioritize early conversations tied to a real building and a likely quantity.
Stelys

Get the right station specified before the job gets harder.

Send the building type, likely quantity, and any rough-in notes. We'll match the right model, flag site questions early, and keep the project moving cleanly.